Under no circumstances will we allow construction by a canal or side sewer, where: Third, the risk of damage to the building due to a sewer failure is not overly taken into account: NB: If the sewers are pumped, construction above or near the agreement will not be permitted and a section 185 “Diversion of a public sewer” will not be requested. During the construction of any construction, you must ensure that there are no public sewers in the area of the planned work. If no construction agreement has been reached, the vendor should have a sewer line review and the records forward to the water company. If the water company is satisfied that the sewers are in good condition, they will give a consolation letter confirming that the sewers are in satisfactory condition. The comfort letter generally satisfies the buyer and its mortgage lender that the Water Company will not take any action to demolish the insulting structure over the public sewers. Please send an email with your full detail after JC all background information relevant to an offer, including proposal plans, pipeline plans, surveys, photos, planning conditions or any other relevant item for the proposed building permit. If you want to build sewers, you need a construction agreement. This is necessary if you plan to build a building, extension, support construction or similar work nearby or directly on an existing canal. The distance from the applicable sewer depends on several factors, including the depth of the sewers, as the sewers are critical, etc. although it is usually 3m. Find out why we need to know that you need to plan a building above or near a canal Everyone can apply for the contract, including an owner or contractor. The most relevant is the one who is qualified, experienced or insured to create the information folder required for the construction contract. Of course, an entrepreneur may have the experience of the physical work associated with it, but this is completely independent of the experience in design and associated professional liability insurance.

The owners of the United Kingdom have no assurance for this work. You must create a Build-Over/Near app through our InFlow online portal if you don`t meet our standard criteria. The other possibility is that the seller will provide the buyer with compensation insurance to protect against financial losses resulting from the construction of the property through a public sewer. It is the fastest and cheapest option, but whether or not insurance is available depends on the circumstances of each case. A construction agreement allows the water company to ensure that the work to be carried out will not adversely affect the underlying sewers and ensures that the water company continues to have sufficient access to the canal for repair and maintenance. If you plan to build nearby or via a public sewer, you should contact the water company before carrying out the work to determine its needs. It depends on the individual situation, but for a construction application through a public sewer, you probably need the following: Sometimes problems arise when owners try to sell their property, which is built partially or completely by a public channel. Conservatories and extensions are the usual criminals. If a Build Over Agreement was not obtained when the work was done, then the water company has the legal right to enter the land to reach the canal, even if that means demolishing the building above the canal. However, if possible, the water company will avoid the damage and look for other ways to enter the sewers, but the risk remains.

If a construction agreement has been reached, the water company has no right to remove or demolish the structure above the sewers. To apply to build a public or nearby canal, please contact InFlow via the link on the right. If the existing tube in a bad